2-in-1 installation

DN 300 liners in a DN 900 host pipe

System

Rehab

Medium

Water

Application area

Industry

Line type

Transport line

Country

Canada

Situation

In 2020, a renowned Canadian oil producer had been investigating for a reliable temporary solution to bypass an old buried 36” pipe used for emptying an effluent/produced water basin on a frequent basis. The operator was looking for a solution to allow to keep operation going before finally replacing the existing steel pipeline.

During the project planning phase, the operator detected that a permanent rehabilitation solution for the old pipe would allow additional operating benefits and a costs decrease.

Special features

2 Primus Liners installed in one host pipe

Using the available space inside the existing pipeline to provide the required volume of water.

Pipeline’s location

The old pipeline runs under ground underneath a busy haul road. Therefore, it would have been extremely difficult to close or partially close it due to the volume and frequency of the traffic.

Multiple bends

The pipeline navigates several bends up to 45°.

Specially developed flange adapter plate

2-meter test section prior to installation

Technical details

Material of host pipe

Steel

Diameter of host pipe

DN 900

Transported fluid

Produced water

Operating pressure

10 bar

Total length

2 x 241 m

Number of sections

2 sections

Number of bends

several up to 45°

Installation time

1 day for relining

Why Primus Line®?

Minimal equipment

Minimal excavation work for the installation process

Continued plant operation

Rehabilitation performed between to emptying cycles

Two weeks from mobilization to demobilization of staff and equipment including the cleaning of the host pipe through to pressure testing of both of the liners.