Situation
Since the pipeline runs along the busy Homburger Straße, traffic had to continue to flow during the construction works.
System
Rehab
Medium
Water
Application area
Utility
Line type
Transport line
Country
Germany
Region
Rhineland-Palatinate
Situation
Since the pipeline runs along the busy Homburger Straße, traffic had to continue to flow during the construction works.
Technical details
Material of host pipe
Ductile cast iron, year of construction 1900
Diameter of host pipe
DN 300
Transported fluod
Potable water
Operating pressure
10 bar
Total length
1,220 m
Number of sections
2 rehabilitation sections
Number of bends
5
Installation time
12 working days
The small footprint with small and few excavation pits was an important factor for the client.
The short rehabilitation period along the busy road led only to minor disruptions.
A sustainable rehabilitation with a service life extension of the existing pipeline by at least another 50 years was the decisive factor.