Renovation of a steel water main in Winnipeg

Situation

The main had an active leak and was originally considered for CIPP. However, using this technology under the river with the multiple bends was not feasible. Therefore, the Primus Line flexible fabric-reinforced pipe (FFRP) was presented to the engineering consultant and the city as the best option for rehabilitation.

Special features

Pipe’s location

under a river and thus under water

Multiple bends

Technical details

Material of host pipe

Steel

Diameter of host pipe

DN 250

Transported fluid

Fresh water

Operating pressure

150 psi

Total length

172 m

Number of sections

1 section

Number of bends

3 x 45°, 1 x 22.5° and 1 x 11.5°

Installation time

1 day