Karriere
Emergency pipeline
The ideal bypass in emergency cases.
In the event that a pipeline is damaged by landslides, floods and forest fires, Primus Line® Overland Piping offers a solution. Up to 2.5 miles of flexible liner with corresponding connectors can be stored in one single container.
In emergency situation, the flexible and spoolable Primus Line® surface pipe can be installed immediately and – depending on the environmental conditions – in a short time frame.